Bathroom Installation in Chatham

Bathroom installation in Chatham from strip out to final seal. Plumbing, electrics, tiling and plastering handled by one team, usually in one to two weeks. Free quotes and guaranteed work.

A Full Bathroom Fit From Start to Finish

The old suite comes out, the room is stripped back and any tired pipework or wiring is renewed while the walls are open. Then walls and floor are made good, the suite goes in, tiling follows and everything is sealed. One team from start to finish.

More Information

Plumbing, Electrics and Tiling

Feeds and wastes are set out in first fix, along with wiring for lights, shaver points, extractor and underfloor heating. Notifiable electrical work is certified. Walls are boarded or skimmed flat so tiles sit true, then grouted and siliconed.

Planning the Layout

Where the soil pipe runs decides where the toilet can sensibly go. Door swing, window position and radiator space do the rest. Moving everything costs more than keeping the layout. We go through it with you before anything is ordered.

About us

We fit bathrooms across Chatham and Medway as part of 15 years of building work. Because the same company plumbs, tiles, plasters and builds, the room does not sit half finished waiting on someone else. Quotes are free, the start date is agreed in advance and the finished bathroom is guaranteed.

  • 15 years building and plastering in Medway

  • Free quotes with a clear price

  • All work guaranteed

  • Open 7:30am to 7pm, seven days

  • Emergency call outs across Chatham

STILL NOT SURE?

Frequently Asked Questions

How much does a bathroom installation cost in Chatham?

The size of the room, the suite you choose, how much tiling you want and whether the layout moves all set the price. Keeping the toilet and bath where they are saves a fair amount. We quote free of charge with labour and materials listed separately.

Do I need to be home during a bathroom installation?

Not for the whole job. Many Chatham customers give us a key and go to work. We do need you there at the start to run through the layout, and again near the end to check positions of rails, mirrors and towel radiators before they are fixed.

Will I have a working toilet during the work?

Usually yes for most of it. The toilet is one of the first things reconnected after strip out and stays usable while tiling and second fix go on. There are short periods when water is off. If it is your only bathroom, tell us and we will plan around it.

Our reviews

t: 07961 020012

Opening hours

Mon: 7:30am - 7pm

Tue: 7:30am - 7pm

Wed: 7:30am - 7pm

Thu: 7:30am - 7pm

Fri: 7:30am - 7pm

Sat: 7:30am - 7pm

Sun: 7:30am - 7pm

© Copyright 2026. D.J.F Plastering & Building ltd. All rights reserved.

Address: 7 Settington Ave, Chatham ME5 0AH